single span tunnel greenhouse
- HengFeng
- Qingzhou city
- 14-20 work days
- 50000 ㎡
1.single span tunnel greenhouse main skeleton -hot dip galvanzied steel pipes
2. greenhouse span can by customzie
3. outside cover with PO film
single span tunnel greenhouse

main introduction:
1. main structure is indepentant structure, in usual will be cover with PO film
2. main structure hot dip galvanzied steel pipes ,have good ventilation ability and anti -snow ability,flexible movement,can by manual or automatic roller film device ventialtion,match with insect mesh and shade mesh
3. compare with multispan greenhouse ,this greenhouse invest small ,easy operation
agriculture greenhouse in dominican republic as dry coffee beans greenhouse:


agriculture greenhouse inside as planting vegetable greenhouse:

film greenhouse:


film greenhouse use 150 micron PO film showing:

factory :

contact:











