plastic film greenhouse
- HengFeng
- Qingzhou,Shandong province ,China
- 14-20 work days
- 50000
1. greenhouse main skeleton hot dip galvanzied steel pipes
2. outside cover with PO film
plastic film greenhouse

plastic film greenhouse:
how to build a plastic film greenhouse?
1. plastic film greenhouse when in building by crops grow,in usual span use 8m,bay 4m ,by location work site wind and snow adjust foundation
2. greenhouse main body building
foundation:4 wall do strip foundation,greenhouse inside do independent foundation,load ability bigger than 110 kpa ,big wind and snow area add foundation
main frame installation:first do pillar installation ,arch roof ,at last use pull rod fixed the whole greenhouse stable ability
cover materials ,4 wall and arch roof can choose use 150 miron PO film,yes outside anti-uv,inside layer condensation droplest slide down by film surface ,inside layer add eva add film tensile ability.service life 5 years.
other matching system
outside shade system,exhaust fan +water curtains reduce temperature system,outside shade system shade rate 75%,under shade mesh reduce temperature 3-5 ℃,fan and water curtains system reduce temperature 4-14 ℃.
other matching system,irrigation system,keep warm quilt,intelligence control system etc
plastic film greenhouse use main data:
| name | specification |
poly film greenhouse - span | 8m |
| poly film greenhouse - bay | 4m |
poly film greenhouse - roof high | 4.8m |
| shade system | outside shade system |
| temperature control system | fans and water curtains |
| other system | customzie |
poly film greenhouse inside planting vegetables:

poly film greenhouse inside planting other vegetable:


greenhouse film manufactures :


greenhouse film manufactures:
greenhouse film manufactures our product quality deep like by all countries friend

contact:











