oster mushroom greenhouse
- HengFeng
- Qingzhou city
- 14 work days
- 50000 ㎡
1. mushroom greenhouse main pipes -hot dip galvanize steel pipes
2. outside cover with white-black film
oster mushroom greenhouse

main introduction:
main skeleton hot dip galvanize steel pipes long service use life
inside matching with oster planting frame
greenhouse outside cover with white-black film ,composite board
greenhouse 2 side leave ventialtion place
inside match air source heat pump equipment ,any time flexible add greenhouse inside temperature or cooling greenhouse inside temperature
auto spray system
oster mushroom greenhouse use main specification and main materials:
| name | specification |
| main frame | hot dip galvanzied steel pipes 48mm x2.5mm 12m length |
| width | 8m |
| length | 33m |
| shoulder high | 2m |
| roof high | 4m |
| ventilation | 2 sides set 1.5m ventor |
| sprayer system | automatic sprayer system |
| air source heat pump equipment | 1 heads |
small shiitake mushroom greenhouse:

Lion's mane greenhouse
Lion's mane greenhouse

factory show:

contact:









